Digital Transformation: Exelon uses non-invasive sensors from Cypress Envirosystems to digitize nuclear plant built in 1975
Posted February 19th 2019
Last week, Cypress Envirosystems and our customer Exelon (the largest electric utility in the US) attended the 23rd Annual ARC Industry Forum in Orlando. The event focused on the Digital Transformation of Industry and Cities, and was attended by over 900 industry executives and media.
Bill Ansley, Innovation Leader at Exelon Nuclear, presented a very compelling case study for digitizing existing plants with non-invasive technologies from Cypress Envirosystems. The cost to implement was 90% less than conventional approaches, and it took only one week to install with no operational disruption. The payback period was well under three years. See Bill’s presentation here:
Download: Exelon WGR Case Study
Additional Resources:
Download: EPRI Technical Brief on Wireless Gauge Reader
Download: Natural Gas and Electricity Article
Wireless Gauge Reader Product information
Contact Us:
Email: info@CypressEnvirosystems.com
Phone: 800-544-5411