Commercial Buildings
Case Studies
Commercial Office Buildings
- Zeller Realty and JLL, 311 S. Wacker — Chicago, IL
- Quick overview
- Zeller Realty Group Presentation
- AEE’s Energy Engineering Journal (pdf starts on page 70)
- Building Operating Management article (pdf) (video presentation)
- ComEd $402,318.50 energy efficiency incentive check presentation to Zeller Realty:
- ComEd’s largest EMS project ever in the Smart Ideas® for Your Business Program
- ComEd’s largest commercial real estate building project
- ComEd’s 2nd largest project ever by incentive amount and 5th by kWh savings
- ComEd case study
- Chicagoland utility rebates for the Wireless Pneumatic Thermostat:
- JLL and a Major Fortune 500 Telecom — Nashville, TN; Charlotte, NC; Raleigh, NC
- Cushman & Wakefield, 345 California Center — San Francisco, CA
- Oakland Shines Program — Oakland, CA
(Case studies written by and M&V performed by Quantum Energy Solutions (QuEST)) - Glenborough Properties — San Francisco & San Mateo, CA
- Article in Green Building & Design
- Article in The BOMA Magazine (page 33)
Health Care
- Winnipeg Health Sciences Centre — Winnipeg, Canada
- Parkland Hospital — Dallas, TX
- Dignity Health, St. Joseph’s Hospital — Phoenix, AZ
- Quick Overview
- Article in Engineered Systems Magazine
- Kaiser Permanente Medical Office Building — Walnut Creek, CA
- Wireless Steam Trap Monitor at Genentech — South San Francisco, CA
- Wireless Steam Trap Monitor at RND Pharma — Indiana
- Wireless Gauge Reader on Air Handler Units at XYZ Biotech — California
Government
- U.S. GSA’s Green Proving Ground, Ronald Reagan Building and Int. Trade Center — Washington, DC
- Summary and conclusion
- Full report
- GSA Recorded Webinar Hosted by Kevin Powell (GSA), Michael Lowell (GSA), and Daniel Howett (Oak Ridge National Laboratory)
- Video: GSA’s Kampschroer and Kinga Porst presentation with Cypress’s Harry Sim
- Project overview
- Overview of technology and applicability to GSA
- NASA Ames Research Center — Moffett Field, CA
- Santa Clara County, Government Offices — San Jose, CA
Higher Education
- University of Toronto
- Automated Buildings article
- University of Toronto Green Ribbon Award
- Energy Technology Assistance Program — San Diego, CA
(Case study written by and M&V performed by Energy Solutions) - State University of New York (SUNY) — New York
- California Institute of Technology (Caltech) — Pasadena, CA
- Western Michigan University — Kalamazoo, MI
K-12
- New York City’s Department of Citywide Administrative Services (DCAS)
- Summary Overview
- Building Operating Management (BOM) webinar
- Full Report
Innovative Demonstrations for Energy Adaptability (IDEA) program
To help reach the City of New York’s goal of reducing greenhouse gas emissions citywide 80 percent by 2050 and to support growth in the clean tech sector, DCAS Energy Management developed the Innovative Demonstrations for Energy Adaptability (IDEA) program. IDEA engages vendors of new or under-utilized energy technologies to test their solutions in City buildings for a period of one year, while addressing a specific building system or operational need. The findings during this period are then reviewed to verify savings, GHG reduction potential and project replicability. The program results are used to inform DCAS Energy Management’s clean tech strategy and investments.
- Los Angeles Unified School District — Los Angeles, CA
- Pennsylvania NE School District — Pittsburg, PA
Hospitality
- Fairmont Hotel — Chicago, IL